The recession in the construction sector is old news. Work is difficult to secure and harder to make pay for many SMEs because of the underlying fragility of the economy. Unfortunately, the present economic climate has exacerbated long standing difficulties for contractors.
Issues such as delayed or reduced payment have been embedded within construction disputes since time immemorial. However, new data highlights the sheer scale of the problems. A survey by StreetwiseSubbie.com suggests nearly 90 per cent of subcontractors have suffered from late payments, non payment or tactics designed to lower the sums paid to them in the past 12 months.
In addition, figures from the Federation of Master Builders suggest that 70 per cent of SMEs surveyed believe material costs will rise in the next six months, while just 20 per cent consider they will be in a position to raise output prices.
The inevitable result is a continuing squeeze on margins at both ends. The need to prioritise cashflow remains essential, while also ensuring proper payment is made for the work undertaken. Managing this often means avoiding debates over payment entitlements wherever possible.
Attempts have been made by government to limit such difficulties. Changes 12 months ago to the Housing Grants Construction and Regeneration Act 1996 were designed to improve cashflow, remove onerous contract conditions and promote Adjudication as a fast track dispute resolution process. However, the latest statistics prove that difficulties over payments continue.
So enough of the negative, what can you do to place yourself in the best position to avoid such difficulties? Here are some tips.
Dictate your own terms
If you are in the enviable position of being able to retain your own contract terms, take advantage of this by ensuring they are worded in your favour.
Knowledge is Power
I am always amazed at how often I encounter entities who have signed a contract without understanding its content. When problems start, the contract is always the first place to look. Knowing your terms in advance is the key. Often in construction contracts there are conditions which require set actions within specific timetables. Compliance with such terms is essential and should be implemented as good practice throughout your organisation.
Understand your Client
Ultimately good relationships tend to translate into better cashflow. By understanding what it is your client is looking to achieve and their own difficulties, you will not only help them avoid issues, but also be able to see the warning signs.
Spot the Danger
Hindsight is a wonderful thing, but it identifies decision making or omissions which contributed to disputes. Take the time to step back and view your position from an objective standpoint and avoid falling into the trap of complacency.
Record, Records, Records
Accurate records are often the difference between success and failure when a dispute arises. Steps such as a daily contract record or photographic diary can make the difference, especially where issues arise regarding the nature and scope of work carried out. The aforementioned changes to legislation allowing oral construction contracts to be referred to Adjudication reinforces the need for a reliable evidential record. Any oral discussions or agreements must be followed up in accordance with the written contract terms.
It is impossible to exclude every issue with non or delayed payment. However, the above practical steps should limit their occurrence and make them easier to resolve. When faced with well-documented contract compliance and supporting evidence, the commercial balance between not paying and entertaining a formal dispute with the significant danger (and cost) of losing often shifts the balance in favour of paying up.
The above advice also applies to employers and main contractors. Serious consideration should be given to the risk and reward to be gained from driving down price. There is no doubt competitive pricing is achievable, but care needs to be taken not to move past the tipping point. Achieving the desired quality can be risked by consistent non or reduced payment, alongside the damaging scenario of a half built construction project with an insolvent contractor.
About the author
Described in the Legal 500 as “sound and informed”, Philip Graham is Head of the Construction Team at DJM Solicitors based in Swansea, South Wales. Philip specialises in advising main contractors, sub contractors and professionals on all aspects of construction law, ranging from procurement and tender issues to dispute resolution.
Philip is Club Secretary of Swansea Wheelers Cycling Club and spends his Sunday on his bike in all weather, and combines this with getting his hands dirty renovating an Edwardian property.
Have you any commercial property events you'd like to tell us about? It could be networking, exhibitions, seminars, industry lunches or sporting fixtures. We will list them for free. Just email newsdesk@propnews.co.uk with the following details: Event name, date, time, venue, cost, booking info and a brief description of the event.
To list your property job vacancies on Property News. Email: richenda@propnews.co.uk.